Daly St – Structure Demolition & Basement Excavation

Type: Demolition
Client: InSync Developments

MCE was awarded the contract to demolish the pre-existing old mechanical workshop and forecourt at the site and excavate basement of proposed new building.

Scope of works:

  • Transport and recycling of demolition waste
  • Removal of asbestos from the building
  • Bulk excavation of 5,500 BCM (bank cubic metres) of earth
  • Transportation of spoil to a pre-designated stockpile area
  • Excavation of detailed basement floor pad footings
  • Excavation of the lift shaft and pump station pits
  • Excavation of drainage trenches and strip footings for pre-cast panels
  • Cutting of concrete footpath to site boundary
  • Drill and install 2 meter bolts to support the mesh for shotcrete
  • Cut basement ramps on three levels.

 