AM Constructions

MCE won the contract to conduct bulk excavation of 23,000 BCM (bank cubic metres) of earth at Finnis Street in the Darwin CBD.

Scope of works:

  • Transport of materials to a specified stockpile area
  • Excavation of detailed basement floor pad footings
  • Drainage works
  • Lift shaft and pump station pit excavation
  • Excavation of strip footings for pre-cast wall panels
  • Boundary wall trim to 150mm from back of pre-cast panels
  • Site dust suppression